Type a 13-digit NSN, a 9-digit NIIN, a manufacturer part number, or a category name such as “gasket”.

Jump to

FSC 2610 × TIRE,PNEUMATIC,VEHICULAR

TIRE,PNEUMATIC,VEHICULAR

2610-01-214-1344 FSC 2610

NSN 2610-01-214-1344 (also written 2610012141344; NIIN 01-214-1344) is a tire, pneumatic, vehicular in Federal Supply Class 2610, Tires and Tubes, Pneumatic, Except Aircraft. 15 manufacturer part numbers from 8 suppliers are on record. It was last purchased in Nov 2026.

Open for bid

No open solicitations on record for this NSN right now.

Search open RFQs on DIBBS →

Can you win it?

This item is coded to be bought directly from the actual manufacturer (AMC 3).

Acquisition method (AMC)
3
Suffix (AMSC)
C
Competition
Coded for a named source

AMC 3: buy directly from the actual manufacturer, second or later time. AMSC C: needs engineering source approval; other sources must qualify first. The codes describe the item's status on record, not any one solicitation. What the codes mean

What it is — can you make it?

Dimensions, the FLIS specification requirements, and the manufacturer part numbers already qualified against this NSN.

Specifications

From the federal catalog (DLA FLIS / PUB LOG) — what your part has to meet. Cited specification documents can be looked up in ASSIST Quick Search ↗, DoD's public spec repository — copy the document number in.

Requirement Value
TREAD PATTERN AAGC CROSS COUNTRY
MAXIMUM INFLATION PRESSURE AAGL POUNDS PER SQUARE INCH (PSI) 100.0
END ITEM IDENTIFICATION AGAV 2320-01-205-2692, TRUCK CARGO, MODEL M24A1; TRUCK 5-TON 6X6 M931A1/A2 AND M945 ABS AND BASIC BRIDGER, M923A1 TRUCK, CARGO, DROPSIDE, 5 TON, M923A2 TRUCK, CARGO, DRPSCRG, W, M924A1 TRUCK, CARGO, 5 TON, 6X6, M925A1 TRUCK, CARGO, DROPSIDE, 5 TON, M925A2 TRUCK, DRPSCRG, M926A1 TRUCK, CARGO, 5 TON 6X6, M927A1 TRUCK, CARGO, 5 TON 6X6, M927A2 TRUCK, CARGO, XLWB, CRG, W, M928A1 TRUCK, CARGO, 5 TON, 6X6, M928A2 TRUCK, CARGO, CLWB, VRG, W, M928A2 TRUCK, DUMP, 5 TON, W/W, W, M929A1 TRUCK, DUMP, 5 TON 6S6, M930A1 TRUCK, DUMP, 5 TON, 6X6, M930A2 TRUCK, DUMP, 5 TON, W/W, M932A1 TRUCK, PRIME MOVER, 5 TON, 6X6, M932A2 TRUCK, PROME, MOVER, 5 TON, M934A1 TRUCK, VAN, EXPANDABLE 5 TON, M935A1 TRUCK, VAN, EXPANDABLE, 5 TON, M935A2 TRUCK, VAN, W/HLG, WO/W, M936A1 TRUCK, WRECKER, 5 TON, 6X6;WHEEL ASSEMBLY NSN 2530-01-506-7243
FEATURES PROVIDED CBBL NO FLAPS
TIRE AIR RETENTION METHOD CQCX TUBELESS TYPE
TIRE PLY ARRANGEMENT CQTK RADIAL
TIRE LOAD MAXIMUM CAPACITY CRDX POUNDS LOAD LIMITS 9960.0
TIRE STRENGTH CRTN LOAD RANGE OAD RANGE J OR LOAD RANGE -
TIRE AND SIZE DESIGNATION CYFM NUMERIC 14.00R20
SERVICE TYPE CZMH OFF THE ROAD TRUCK-BUS
ITEM TYPE CATEGORY DAAH TIRE
SPECIAL FEATURES FEAT TIRE SPECIFICATION IS RESTRICTED TO APPROVED MANUFACTURERS GOODYEAR AT2A LOAD RANGE J(P/N 152-705-961) AND MICHELIN XZL LOAD RANGE M (P/N 59177); ADDITIONAL MANUFACTURERS MUST BE PREAPPROVED PER SAE J 2014; VALVE CAP MUST BE USED 2640-01-098-2029 AND EXTENSION MAY BE USED 2640-01-205-2474, TIRE WEIGHS 185 POUNDS OR CUBE: 0023.114 CUBIC FEET(UNIT PACKAGE CUBE/TIRE ONLY APPLIES) GE CUBE/TIRE ONLY APPLIES)
MATERIAL MATT RUBBER NATURAL

Manufacturer part numbers

Commercial part numbers cross-referenced to this NSN in the federal catalog — the parts that have been accepted as satisfying this stock number, and who makes them.

Part number CAGE Manufacturer
02021050 12195 MICHELIN NORTH AMERICA, INC DBA MICHELIN NORTH AMERICA, INC
12301105 19207 U S ARMY TANK AUTOMOTIVE COMMAND AMSTA-IM-MM
12876 12195 MICHELIN NORTH AMERICA, INC DBA MICHELIN NORTH AMERICA, INC
14.00-20 19207 U S ARMY TANK AUTOMOTIVE COMMAND AMSTA-IM-MM
14.00R20 19207 U S ARMY TANK AUTOMOTIVE COMMAND AMSTA-IM-MM
152-705-961 04NP3 GOODYEAR TIRE & RUBBER COMPANY, THE DBA GOODYEAR
152-705-961 73842 GOODYEAR TIRE AND RUBBER CO THE
16EN1285 A00AM E.C.A ETABLISSEMENT CENTRAL DES APPROVISIONNEMENTS DES FORCES ARMEES ROYALES
3106046 45152 OSHKOSH CORP
3106046 75Q65 OSHKOSH DEFENSE LLC
57336 12195 MICHELIN NORTH AMERICA, INC DBA MICHELIN NORTH AMERICA, INC
59177 12195 MICHELIN NORTH AMERICA, INC DBA MICHELIN NORTH AMERICA, INC
71701 12195 MICHELIN NORTH AMERICA, INC DBA MICHELIN NORTH AMERICA, INC
SAE-J-2014 81348 FEDERAL SPECIFICATIONS PROMULGATED BY GENERAL SERVICES ADMINISTRATION WASHINGTON DC
X/GP3/TYRA/CLA/T/14R20/J 81348 FEDERAL SPECIFICATIONS PROMULGATED BY GENERAL SERVICES ADMINISTRATION WASHINGTON DC

What it pays — so you can quote

The government's own price and demand record for this NSN — what past awards cleared at, so you know where to land your quote.

Latest unit price
—
Purchases
0
Total spend
—
Nov 3, 2026
Last purchased
200 · 200.0/yr
Purchase records
$8,074,248
Total demand
$40,371
Latest award total

Compare with other items

Purchase history

No priced purchases on record for this NSN yet.

Related contract actions

Contract action totals, not unit prices — obligation amounts from USAspending for related awards, shown for context only. These do not appear on the price chart above.

Action date Award # Recipient Agency Obligation
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4047 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4046 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4045 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4044 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4043 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4042 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4041 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4040 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4039 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4038 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4037 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4036 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4035 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4034 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4033 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4032 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4031 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4030 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4029 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4028 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4027 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4026 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4025 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4023 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4022 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4021 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4020 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4019 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4018 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4017 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4016 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3993 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3991 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3990 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3989 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3988 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3984 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3980 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3977 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3974 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3972 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3969 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3967 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3961 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3960 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3957 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3956 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3951 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3948 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3943 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3917 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3916 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3915 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3914 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3913 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3912 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3911 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3910 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3909 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3908 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3907 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3906 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3905 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3904 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3903 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3900 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3899 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4024 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4015 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4014 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4013 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4012 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4011 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4010 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4009 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4008 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4006 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4005 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4004 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4003 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4002 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4001 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4000 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3999 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3998 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3997 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3996 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3995 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3994 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3992 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3987 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3986 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3985 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3983 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3982 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3981 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3979 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3978 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3976 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3975 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3973 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3971 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3970 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3968 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3966 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3964 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3963 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3962 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3959 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3958 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3955 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3954 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3953 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3952 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3950 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3949 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3947 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3946 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3945 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3944 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3942 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3941 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3940 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3939 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3938 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3937 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3936 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3935 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3934 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3933 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3931 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3930 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3929 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3928 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3927 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3926 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3925 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3924 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3923 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3922 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3921 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3920 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3919 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F3918 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4068 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4067 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4066 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4065 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4064 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4063 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4062 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4061 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4060 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4059 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4058 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4057 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4056 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4055 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4054 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4053 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4052 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4051 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4050 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4049 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Oct 28, 2026 SPE7LX19D0029/SPE7LX27F4048 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F5293 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F5287 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F5259 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F5170 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F4990 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F4969 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F4949 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F4948 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F4933 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F4928 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F4927 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F4911 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F4910 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F4908 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F4896 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F4895 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F4887 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F4886 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F4885 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F4884 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F4881 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F4879 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F4878 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F4877 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F4875 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F4874 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F4873 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F4872 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F4871 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F4870 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F4869 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 2, 2026 SPE7LX19D0029/SPE7LX27F5369 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 3, 2026 SPE7LX19D0029/SPE7LX27F5549 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 3, 2026 SPE7LX19D0029/SPE7LX27F5535 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371
Nov 3, 2026 SPE7LX19D0029/SPE7LX27F5532 ↗ ASRC FEDERAL FACILITIES LOGISTICS, LLC — $40,371

Demand history

Who wins this item

Does one supplier win this every time, and are the winners on the listed-source list? One dot per award.

  • Award in the last 2 years
  • Older award
ASRC FEDERAL FACILITIES LOGISTICS, LLC
last award Nov 2026
Not listed
E.C.A ETABLISSEMENT CENTRAL DES APPROVISIONNEMENTS DES FORCES ARMEES ROYALES
no award yet
Listed source
FEDERAL SPECIFICATIONS PROMULGATED BY GENERAL SERVICES ADMINISTRATION WASHINGTON DC
no award yet
Listed source
GOODYEAR TIRE & RUBBER COMPANY, THE DBA GOODYEAR
no award yet
Listed source
GOODYEAR TIRE AND RUBBER CO THE
no award yet
Listed source
MICHELIN NORTH AMERICA, INC DBA MICHELIN NORTH AMERICA, INC
no award yet
Listed source
OSHKOSH CORP
no award yet
Listed source
OSHKOSH DEFENSE LLC
no award yet
Listed source

ASRC FEDERAL FACILITIES LOGISTICS, LLC won 10 of the last 10 awards. ASRC FEDERAL FACILITIES LOGISTICS, LLC won without being a listed source.

Open RFQs on DIBBS → DIBBS award history ↗

About this data

  • Unit prices: DLA DIBBS award records — every row links to its government record.
  • AMSC: latest observed value from DIBBS solicitation history as of Nov 1, 2026.
  • Contract action totals: USAspending, context only.
  • Data last refreshed: 2026-11-04.
  • Full methodology →
Cite this page
Citation

NSN Explorer. "TIRE,PNEUMATIC,VEHICULAR." nsnexplorer.com, https://nsnexplorer.com/nsn/2610-01-214-1344/. Data as of November 7, 2026.

Link

https://nsnexplorer.com/nsn/2610-01-214-1344/